● BaseBloom · craft series II — the assembly cuts04 / construction

Plumb. Level. Sequenced.

STEEL GOES UP
IN ORDER.

Scroll — footings, columns, spans, deck: three storeys erect themselves the way an ironworker reads the sequence. Drag to walk the site. Click to drop the plumb line and check the frame.

PHASE I — FOOTING

Every floor stands on a decision made two floors down. Sequence is the craft — everything else is just lifting.

Steel, Sequenced is a BaseBloom assembly concept for general contractors: phase-by-phase project pages that replay the build, bid forms that read like a walkthrough, and the license-bond-insurance page nervous clients look for.

The sequence sheet

SEQ 01

Below grade

Footings and foundations — the phase that decides every phase after. Documented before it disappears.

SEQ 02

The erection

Columns, beams, decks. Time-lapse pages that show a building learning to stand.

SEQ 03

The top-out

The last beam signed by the crew. The story clients hire — and the photo they remember.

A SITE ERECTED
SQUARE AND TRUE.

$750–$1,500 build · $100–$250/mo care plan · live in a week

See your free demo →